Resources

Friday, August 16, 2013

Toiling, er, Tiling



I've been working pretty much nonstop this last week, finishing the large tile wall in my kitchen. Cutting the tiles to fit around my two windows went slower than expected. I had to cut some very tiny pieces of tile for small gaps that needed to be filled.
Just one of many small pieces of tile I had to cut.

The tile all set and ready for grout.

Wednesday evening, I added the grout. I chose a color called quartz that is a pretty close match to my countertops.
Grouting.

What I didn't expect though was how long it has taken me to clean the excess grout off of the tiles. After two solid days of work and help from my friend Bill, my nephew Sam and my daughter Una and her boyfriend Jordan, the tile is looking good but my hands are a mess.

Una and Jordan cleaning tiles.
After nonstop tile work, my friend Bill lifted my spirits today by helping me move my oven into place and hook up the water line to my refrigerator.  I'm feeling much better now that I have two appliances in place and cold water and ice at my beck and call.

The dishwasher is next.

2 comments:

  1. Heidi: Your kitchen is looking fantastic! You are so blessed to have such great friends to help you (Bill, and of course, Una, Jordan, Sam, and JOE, and probably Maya too).
    Miss you!
    Andrea

    ReplyDelete
    Replies
    1. Thank you Andrea. I am blessed to have a big support group who put up with me and my projects.
      I miss you too.
      :)Heidi

      Delete